
Akinwande Soji-Ojo
The Federal Airports Authority of Nigeria (FAAN) has announced plans to disconnect power at Lagos airport on June 5, due to maintenance work.
A statement by FAAN鈥檚 Director of Public Affairs and Consumer Protection, Obiageli Orah, said the maintenance is necessary to address urgent issues with the bus riser 11 kilo-volt-amperes (KVA) high tension (HT) panel located on the ground floor, North of International Terminal 2 (ITZ-2).
鈥淭he Federal Airports Authority of Nigeria (FAAN) hereby notify all stakeholders and the public that a maintenance shutdown of power supply shall occur at the International Terminal 2(ITZ-2) between 13:30 and 14:30 hrs on Wednesday, June 05, 2024.
鈥淭his is as a result of the urgent need to verify the issues affecting the Bus Riser 11KVA high tension (HT) panel on the ground floor, North of the International Terminal 2 (ITZ-2) of the Murtala Muhammed Airport, Lagos.
“FAAN would ensure that the shutdown of power supply is with very minimal disruption to flight operations and passenger facilitation,鈥� she said.
Orah added that airlines, including Rwanda Air, Egypt Air, and Qatar Air operating during the maintenance period will be moved to international terminal 1 (ITZ-1) for check-in and arrival procedures.
She advised all passengers on these flights to take note, expressing regret for any inconvenience the maintenance may cause to stakeholders and the travelling public.


















