ºÚÁϲ»´òìÈ

  • Latest
  • Trending
  • All
  • News
  • Business
  • Politics
  • Science
  • World
  • Lifestyle
  • Tech
‘You are economical with truth’- Oyo govt slams Fashola over comment on Lagos-Ibadan expressway

‘You are economical with truth’- Oyo govt slams Fashola over comment on Lagos-Ibadan expressway

October 24, 2022
Tinubu congratulates Atiku at 80, hails his contributions to democracy, education

Tinubu congratulates Atiku at 80, hails his contributions to democracy, education

November 25, 2026
THE LOUD BONE    Thoughts and Notes on a Quintessential newspaperMAN @ 80 (Part 2)

THE LOUD BONE Thoughts and Notes on a Quintessential newspaperMAN @ 80 (Part 2)

November 25, 2026
Oyo APC governorship candidate Alli unveils 10-point manifesto for productive, inclusive state

Oyo APC accuses APM of smear campaign, says Alli won’t sack workers if elected

November 25, 2026
Osun gov Adeleke resigns from PDP, blames leadership crisis

Adeleke pledges improved welfare, infrastructure in second term

November 25, 2026
FULL LIST: Police declare nine wanted over parcel containing bullets sent to First Bank MD

FULL LIST: Police declare nine wanted over parcel containing bullets sent to First Bank MD

November 25, 2026
Soun unveils O’GIFTS Scholarship, targets 500 Ogbomoso indigenes

Soun unveils O’GIFTS Scholarship, targets 500 Ogbomoso indigenes

November 25, 2026
Ace Nollywood actor Pete Edochie dies at 79

Ace Nollywood actor Pete Edochie dies at 79

November 25, 2026
Odu’a @50: Omole urges firm to embrace AI, strengthen governance

Odu’a @50: Omole urges firm to embrace AI, strengthen governance

November 24, 2026
Bola Ige’s murder: Ladoja faults Akande’s claim, threatens legal action

Olubadan breaks silence on removal of Mogajis, rules out politics

November 24, 2026
Confusion as CBN denies asking commercial banks to accept old N500, N1000 notes

Naira falls to ₦1,394/$, weakest since March

November 24, 2026
US court sets $1m bond for Olunloyo’s son over alleged kidnapping, shooting

US court sets $1m bond for Olunloyo’s son over alleged kidnapping, shooting

November 24, 2026
Court nullifies Omo-Agege’s NDC senatorial nomination, orders INEC to delist him

Court nullifies Omo-Agege’s NDC senatorial nomination, orders INEC to delist him

November 24, 2026
  • Contact Us
Wednesday, November 25, 2026
  • Login
ºÚÁϲ»´òìÈonline
  • Home
  • Politics
  • Business
  • Entertainment
  • Technology
  • World
    • Africa
    • Americas
    • Asia
    • Europe
  • Opinion
  • Interview
  • Exclusives
  • ºÚÁϲ»´òìÈ e-MagazineNew
No Result
View All Result
ºÚÁϲ»´òìÈonline
No Result
View All Result
Home News

‘You are economical with truth’- Oyo govt slams Fashola over comment on Lagos-Ibadan expressway

by admin
October 24, 2022
in News
0
491
SHARES
1.4k
VIEWS

Akinwande Soji-Ojo

The Oyo State Government has faulted the claim of the Minister of Works and Housing, Babatunde Fashola (SAN), that it was responsible for the delay in the completion of the Lagos-Ibadan expressway, saying he is economical with the truth.

RelatedPosts

Tinubu congratulates Atiku at 80, hails his contributions to democracy, education

Adeleke pledges improved welfare, infrastructure in second term

FULL LIST: Police declare nine wanted over parcel containing bullets sent to First Bank MD

Speaking at the inaugural edition of President Muhammadu Buhari’s Administration Scorecard 2015-2023, organised by the Ministry of Information and Culture in Abuja last Wednesday, Fashola had said that the construction of a drainage channel by Oyo State Government had slowed down work for contractors on the Lagos-Ibadan expressway.

The minister said the 127.6km expressway had recorded construction progress and called for calm over the delays encountered at the Ibadan and Lagos axis of the expressway.

“The Oyo State Government is building a drainage channel across the road, so we are having difficulties because the contractor has slowed down and we have to slow down too.

“We do not want to finish the road and come back to destroy it for the drainage channel construction.

“On the Lagos axis, we are working on the last six kilometres into Lagos; that is a very highly densely populated area. We left it for the last because we knew it to be the most difficult. We are appealing that you bear with us and we are hoping that very soon there will be relief there,” Fashola had said.

But in a statement signed by the Commissioner for Information, Culture and Tourism, Dr. Wasiu Olatubosun, on Monday, the Oyo State Government said it is imperative to set records straight as a government committed to ensuring that the good people of Oyo State enjoy the dividends of good governance.

The statement read: “Firstly, we need to clarify that two major projects, the dualization of the 8.2km Agodi – Gate – Old Ife – Adegbayi Junction Road and a few projects under the World Bank assisted Ibadan Urban Flood Management Project (IUFMP) interface with the 127.6 km Lagos-Ibadan Expressway project at CH 115-117, CH 117 and CH 125. In real terms, this stretch is less than 3 kilometers.

“Secondly, we would have expected that the Federal Ministry of Works and Housing would have reached out to us to find out how long we would need to complete the aforementioned projects being that Oyo State has been in communication with the Ministry. In fact, just about a year ago, we had requested permission from the Federal Ministry of Works and Housing (through the Director of Federal Highways) to dualize the underpass at CH 115 -117. We were advised to make sure that the diversion routes are completed before embarking on the diversion. We complied 100%.

“Also, it is on record that the majority of the 22km stretch of the Lagos -Ibadan Express Road between the old Toll gate Ibadan– Ojoo is still work in progress. Earthwork between Iwo Road Interchange and Ojoo has only just commenced. While work between the Old Ibadan Tollgate and Onipepeye is still in progress and characterized by road diversions. With all this work yet to be done, why is the Federal Minister blaming the Oyo State Government for delaying the project?

“Had the Federal Minister reached out to the Oyo State Government, we would have told him that although the contract for work on the dualization of Agodi-Gate- Old-Ife Road – Adegbayi Junction which includes an underpass interface with the Lagos-Ibadan Expressway at Onipepeye had to be terminated at 60% in September 2022 due to slow pace of work by the contractor, whose contract was awarded under the previous administration, the Oyo State Government is in the process of re-awarding the remaining 40% with a February 2023 delivery date. We have also provided 500m diversions of the main expressway lanes from the impacted site to allow traffic flow on both sides. Similarly, the IUFMP projects also have 4-month completion schedules.

“Given that the pace of work on the Lagos-Ibadan Expressway has been at 10/km per year (it has taken almost 10 years since 2013 for work so far done on the 127.6km stretch of road to be completed), it could take about 2 years to finish the work and get to CH 127.6. Why then will our projects with 4-month remaining be the source of delay of completion of the project?

“One would also wonder why it was okay to skip the Lagos end of this project between Berger and Old Lagos Tollgate and the about 2km stretch between Shagamu and Ogere, but it suddenly becomes impossible to skip the less than 3km CH 115-117 and 125 and continue work on the remainder 22km.

“From all of the above, it is clear that the Federal Minister did not have the right facts in ascribing blame for non-completion of the Lagos-Ibadan Express Road to the Oyo State Government. Even after the less than 3km CH 115-117 and 125 is completed in February 2023, we doubt if the Lagos-Ibadan Expressway project would be anywhere near completion to CH127.6.”

Related

What’s your Reaction?
Like
Like
0
Dislike
Dislike
0
Laugh
Laugh
0
Angry
Angry
0
Sad
Sad
0
Accurate
Accurate
0
0 Shares
Facebook Twitter WhatsApp Linkedin Messenger
×

Share this post!

Facebook Twitter WhatsApp Linkedin Messenger Telegram Tumblr

Tags: FasholaLagos-Ibadan ExpresswayMinisterOyo State Government
Previous Post

2022: UBA’s gross earnings hit N608bn, reports 12.3% growth profit in Q3

Next Post

Diezani forfeits two Abuja mansions, two luxury cars to FG

admin

admin

Related Posts

Oyo rejects extension of retirement age for civil servants
News

Oyo govt begins 2026 bursary screening for final-year students, releases timetable

by ºÚÁϲ»´òìÈ Reporter
November 7, 2026
0

By Emmanuel Adeleke The Oyo State Government has announced the commencement of its 2026 bursary screening exercise for indigenes in...

Read moreDetails
‘It’s an aberration’- Oyo govt overrules Soun, declares removal of Saka Balogun illegal

‘It’s an aberration’- Oyo govt overrules Soun, declares removal of Saka Balogun illegal

October 23, 2026
FULL LIST: Makinde inaugurates LAUTECH Teaching Hospital board, approves payment of wage arrears

No confirmed diphtheria case in Oyo, Govt replies Alli’s campaign organisation

October 13, 2026
Oyo rejects extension of retirement age for civil servants

‘It wasn’t built by us’ — Oyo govt denies abandoning Ogbomoso 80-bed hospital

October 5, 2026
Next Post
Diezani forfeits two Abuja mansions, two luxury cars to FG

Diezani forfeits two Abuja mansions, two luxury cars to FG

ºÚÁϲ»´òìÈonline

Copyright © 2020
ºÚÁϲ»´òìÈ. Optimized by

Navigate Site

  • Breaking News
  • Business
  • Entertainment
  • Interview
  • Newpeak Magazine
  • Magazine/Exclusives
  • Politics

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • Home
  • Latest News
  • Politics
  • Business
  • Entertainment
  • Technology
  • World
  • Opinion
  • Interview
  • Research
  • Exclusives
  • e-Magazine
  • Contact Us

Copyright © 2020
ºÚÁϲ»´òìÈ. Optimized by