
By Oyindamola Davies
President Bola Tinubu has approved the reconstruction of the Lagos-Ibadan Expressway with reinforced concrete pavement and the 400-kilometre extension of the fourth legacy highway.
Minister of Work, David Umahi, disclosed this on at a press briefing on Thursday.
The president also approved the completion of the abandoned Ibi Bridge in Taraba State, the construction of the 5.76-kilometre Lau Bridge across the Benue River, and the dualisation of an additional 400 kilometres of the East-West Road.
Speaking on the approvals, Umahi said the projects reflect the Federal Government’s commitment to renewing critical infrastructure, improving connectivity, boosting economic growth and strengthening national integration.
He disclosed that the extension of the fourth legacy highway, approved on Wednesday, increases the corridor from about 700 kilometres to roughly 1,100 kilometres.
Describing the decision as unprecedented, the minister said: “The greatest story is that yesterday, President Bola Tinubu approved the addition of 400 kilometres to our fourth legacy road. That is unprecedented.”
According to him, the extension will take the highway into Taraba State, creating a stronger transport link between the North Central and North East.
“That project will pass through the place of General Gowon. It will pass through the place of Solomon Lar. It will pass through the place of the present National Chairman of the APC. It goes down to Taraba, and that is unprecedented,” he said.
Originally designed to run from Akwanga in Nasarawa State to Maiduguri in Borno State through Plateau, Bauchi, Gombe and Biu, the highway will now extend into Taraba State.
Umahi also announced that Tinubu approved the reconstruction of the Lagos-Ibadan Expressway after sections of the highway deteriorated less than five years after rehabilitation.
“The president approved yesterday the reconstruction of the Lagos-Ibadan Road, and that is the justification for our fight for the use of reinforced concrete pavement,” he said.
Explaining the decision, Umahi said the 135-kilometre dual-carriageway had continued to fail despite repeated repairs.
“It is 135 kilometres by two carriageways. That project is not up to five years old, yet it has already started failing. We took journalists there. We took members of the National Assembly there. You could see the road failing. They repaired it, and it still failed,” he added.
The minister revealed that the Ibi Bridge in Taraba State was abandoned after reaching about 40 per cent completion.
“That bridge was awarded in 2018, got to about 40 per cent completion and was abandoned. Yesterday, the President approved the review and completion of the Ibi Bridge in Taraba State.
“The Lau Bridge in Taraba State, which is 5.76 kilometres across the river, the president approved that it should be designed, procured and awarded.
“The Ppesident also approved 400 kilometres of the dualised East-West Road running from Lokoja to Benin. This is another very important intervention in our road infrastructure,” Umahi said.
The minister noted that the projects would improve road safety, reduce travel time and facilitate trade across key transport corridors.
Umahi also announced that the Lagos-Calabar Coastal Highway has been renamed the President Bola Ahmed Tinubu Coastal Highway, saying the Ministry of Works adopted the name in recognition of Tinubu’s long-standing vision for the project.
“That highway is named President Bola Ahmed Tinubu Coastal Highway. By the powers conferred on me as Minister of Works, in consultation with my Permanent Secretary, the Minister of State, directors and staff of the ministry, we decided to name it after him because of his dream for it.
“He had that dream about 27 years ago as governor of Lagos State. It is one thing to dream and another thing to have the grace of God to actualise that dream. This is one man who dreams and has the grace and divine mandate to actualise that dream,” the mimister added.
Providing updates on ongoing projects, the minister said work is progressing on the 750-kilometre coastal highway across Lagos, Ogun, Ondo, Akwa Ibom and Cross River States.
According to him, the first section from Victoria Island to Eleko village has become a model for modern highway construction, while the second section from Eleko village to the Lagos-Ogun boundary is about 60 per cent complete and expected to be substantially finished by the end of November, except for some bridge works.
He added that construction is also advancing on the Sokoto-Badagry Super Highway and the Trans-Sahara Highway, both of which are expected to improve connectivity and reduce travel time across the country.
Umahi said the Federal Government’s four legacy projects鈥攖he Lagos-Calabar Coastal Highway, Sokoto-Badagry Super Highway, Trans-Sahara Highway and Akwanga-Maiduguri Highway鈥攁re central to the Tinubu administration’s Renewed Hope Agenda and are designed to drive economic development through improved road infrastructure.

















